Low Energy Electromagnetic Physics
|
Project | Status on 30 June 2004 | Status on 31 Dec 2004 |
Release Milestone: June 2004 |
||
Design and code review of Penelope processes | 1st iteration done | |
Optimised Bremsstrahlung angular distribution | Done | |
Prototype of photoelectric angular distribution | Done | |
Precise range (p/ion) | Done (VI), design not acceptable | |
Use new models for fluctuations (p/ion) | Done (VI), design not acceptable | |
Option to select Tmax to build tables (p/ion) | Done | |
Release Milestone: December 2004 |
||
New model of photoelectric angular distribution | OOAD done, errors found in theoretical papers, implementation postponed, subject to corrected theoretical calculations | |
New or improved model of PIXE | Done | |
Improved hadron/ion system testing | Done | |
Precise range (electron) | Done (VI), design not acceptable | |
Use new models for fluctuations (electron) | Done (VI), design not acceptable | |
Option to select Tmax to build tables (electron) | Done | |
Currently under investigation |
||
OOAD - Design iteration in atomic relaxation |
Project | Status on 30 June 2004 | Status on 31 Dec 2004 |
Release Milestone: June 2004 |
||
Code review of examples | Done | |
Hadrontherapy 1st release + validation with experimental data |
Done | |
Treatment head 1st release |
Done |
|
Radioprotection Refocused to 'shielding in space environment' |
Done | |
Release Milestone: December 2004 |
||
Gamma-ray telescope | Maintenance | |
X-ray telescope | Maintenance | |
Brachytherapy | Maintenance | |
Fluorescence Introduce PIXE |
Done | |
Underground | Maintenance | |
Composite calorimeter | Maintenance | |
lAr calorimeter | Maintenance | |
RICH | Maintenance | |
Radioprotection Extended release |
Done | |
Hadrontherapy Extended release |
Done | |
Treatment head Extended release |
Done | |
Currently under investigation |
||
Cosmic Ray Experiment example | ||
Medical Imaging example | ||
Integration of PI analysis tools | Done | |
General purpose dosimetric example | ||
Improved documentation of DICOM extended example | Done |
Project | Status on 30 June 2004 | Status on 31 Dec 2004 |
Release Milestone: June 2004 |
||
Additional GoF algorithms | Done | |
Extended set of quantitative validation results | Done | |
Release Milestone: December 2004 |
||
Filtering | Done for internal release, general OOAD to be planned | |
Treatment of errors | Done for internal release, general OOAD to be planned | |
Extended set of quantitative validation results | Done | |
Design iteration of test50 (with test plug-ins) | Done | |
Currently under investigation |
||
Automated regression testing | ||
GoF for 2-D distributions |
Project | Status on 30 June 2004 | Status on 31 Dec 2004 |
Geant4 Physics Book | NIST validation, production in progress | NIST validation: results presented at conferences, publication writing in progress |
Last update 30 December 2004 - Maria Grazia Pia