Low Energy Electromagnetic Physics
|
![]()
| Project | Status on 30 June 2003 | Status on 31 Dec 2003 |
|
Release Milestone: April 2003 |
||
| Update to new "cuts-per-region" design | Done, emlowen-V05-00-18 | |
|
Release Milestone: June 2003 |
||
| Penelope processes, photons | Done, emlowen-V05-01-03 | |
| Re-design of Bremsstrahlung angular distribution | Done, emlowen-V05-01-03 | |
| Ziegler 2000 model | Done, emlowen-V05-01-03 | |
|
Release Milestone: December 2003 |
||
| Penelope processes, e- and e+ | 1st release of
Bremsstrahlung done, emlowen-V05-01-03; ionisation in progress |
Done, geant4-06-00-00 |
| New models of Bremsstrahlung angular distribution | In progress | Done |
| New model of PIXE | In progress | |
| Improve coverage of hadron/ion system testing | In progress | In progress |
|
Release Milestone: to be defined (2003 or later) |
||
| Polarised Rayleigh | In progress | Published
by one of the developers under his name only; this person is not
considered appropriate for WG membership any longer. The release is postponed until a thorough clarification of the correctness of this developer towards the WG. |
| Polarised Photoelectric | ||
| OOAD - Final state cycle of EM re-design | Designed, to be implemented | Done for Bremsstrahlung |
| OOAD - Design iteration in atomic relaxation | Tentative milestone Dec 2003, to be confirmed | Postponed |
| Project | Status on 30 June 2003 | Status on 31 Dec 2003 |
|
Release Milestone: June 2003 |
||
| Gamma-ray telescope Implement recommendations of the code review Use modular PhysicsList Option for using LowE/standard e.m. physics Introduce hadronic physics |
|
|
| X-ray telescope Implement recommendations of the code review Bug fixes |
Done, XrayTel-V05-02-01 | |
| Brachytherapy Implement recommendations of the code review |
Done, brachy-V05-01-04 | |
| Fluorescence Implement recommendations of the code review |
Done, XrayFluo-V05-01-01 | |
| Underground Implement recommendations of the code review Fix to physics list - reduction in object creation Addition to visualisation - HEPREP implementation Fix to hits collection - photocathode material could |
Done, DMX-V05-01-02 | |
| Composite calorimeter Implement recommendations of the code review |
Done, ccal-V05-01-01 | |
| lAr calorimeter Implement recommendations of the code review |
Done, lAr_calorimeter-V05-01-00 | |
| RICH 1st release |
Done, Rich-V05-01-00 |
|
| Radioprotection 1st release |
||
|
Release Milestone: December 2003 |
||
| Gamma-ray telescope Introduce FITS output Geometry with GDML Introduce Radioactive Decay Review User Requirements Design iteration |
||
| X-ray telescope | ||
| Brachytherapy Run from the web Integration with DIANE (parallel, GRID) Input from CT |
Done (see talk at Como 2004); will be released after publication | |
| Fluorescence Design iteration to introduce alternative geometries Design iteration to better deal with materials |
Done | |
| Underground | ||
| Composite calorimeter | ||
| lAr calorimeter | ||
| RICH | ||
| Radioprotection Geometry to define a digital anthropomorphic phantom Input from CT, PET, SPECT Voxel-based definition of tissue Definition of a reference phantom |
The
group responsible for this example quit the Geant4 Collaboration. The INFN-Genova group will take over the responsibility for the radioprotection example, redefining its scope for release in 2004. |
|
| Hadrontherapy 1st release + validation with experimental data |
In progress | |
| Treatment head 1st release |
In progress | |
|
Release Milestone: to be defined (Dec 2003 or 2004) |
||
| GEANE-like | The developer responsible for this project quit the Geant4 Collaboration. | |
| Project | Status on 30 June 2003 | Status on 31 Dec 2003 |
|
Release Milestone: June 2003 |
||
| General EM Physics test (test50 ) | Done (1st release) | |
| First set of quantitative validation results (NIST) | Done, EM Physics Test summary | |
| First release of the GoF Toolkit | Done, StatisticsTesting-V1-00-00 | |
|
Release Milestone: December 2003 |
||
| Integration of test50 in system testing | Subject to availability of STT | Done |
| Integration of statistics testing and test50 | In progress | Done |
| Automated regression testing | To be discussed with STT | Done at INFN-LNGS |
| Extended set of quantitative validation results | In progress | Done |
| Extension of GoF Toolkit (AD, CvM, errors...) | In progress | Done |
| Project | Status on 30 June 2003 | Status on 31 Dec 2003 |
|
Release Milestone: June 2003 |
||
| DICOM interface, 1st release based on user contribution + major design and code review by G4 | Done (1st release) | |
|
Release Milestone: December 2003 |
||
| DICOM interface, improved OOAD release | ||
| DIANE: example of usage with Geant4 | In progress | In progress |
Last update 27 April 2003 - Maria Grazia Pia