Hee
ANALYSIS IN GENOVA
-
Transparencies presented at the Team B meeting - Oct.27,1997
-
New results for the Nov.11,1997
LEPC
meeting
-
Comparison
of
Pythia with 4 fermion generators
-
Generator level study of the m(e+e-)
spectrum in the hee production and fsr effects
-
Status of the analysis and preliminary draft Feb
20,98
-
Report on hee analysis at 189 GeV Sep
21,98
-
Update of hee analysis at 189 GeV Feb
8,99
-
Preliminary hee analysis at 189 GeV using 98D2 Mar
8,99
-
Preliminary analysis of the 1999 data Sep
17,1999
-
Hee analysis of 1999 data for Moriond Feb
18,2000
-
Comparison of hee analysis at 200 GeV using REMCLU
package
-
Preliminary analysis of 2000
data
-
Status report Jul
11, 2000
-
Status report Sep
12, 2000
-
Report
on kinematical fit with ISR
-
Status report Oct
17, 2000
-
Status report Dec
5, 2000
-
Updated
results
-
Test of HZHZ with ZZ fusion Feb
26,2001
-
Updated efficiency
table for 1999 signal MC
-
Test of 3-jet rate in HZHA-PYTHIA
6.156
-
Comparison
between processing C and D (waiting for E)
-
Presentation
at the Delphi Week in Delphi (19-26 Sep. 2001)
-
Check on A0E
processing.
-
Hee
status report - 26 Nov 01 Higgs meeting.
-
Hee status report - 21
Jan 02 Higgs meeting
-
Hee status report - 25
Feb 02 Higgs meeting